Server unit rental in the PARKOVYI Data Сenter: this is

Power per unit – equipment adaptation based on client’s request

Electricity consumption – personalized calculation of energy consumption even for a single server

Structured cable system – high-quality and reliable physical connection via copper and fibre optic cables

Fault tolerance and continuous operation, confirmed by TIER III Design Certificate from the Uptime Institute

Ready infrastructure – migration to a pre-prepared infrastructure with support from Data Center specialists

Stable operation without a single second of downtime, unaffected even by a full-scale intrusion

Calculation of the cost of unit colocation:
Placement of equipment:
1U
12U
Internet channel speed
Power of each unit
300 Watt
Additional services:
Your choice
Equipment dimensions
6U
2 700 UAH
Power
300 Watt
1290 UAH
Placement of equipment:

The PARKOVYI Data Center is capable of providing the client`s equipment colocation in 400 server modules and calculating power consumption for each client separately. The modules in the Data Center are equipped with A-class security tools and the VESDA microclimate control and early warning system. The reliability and continuous power supply are ensured by independent power sources of 4 MW each, four uninterruptible power supply units of 1.6 MW and diesel generator sets. The diesel generator sets can capable the autonomous operation of the entire Data Center for up to 10 days without the need for additional fuel supply.

Certificates and statuses
Infrastructure
of the Data Center

Territory, autonomy and security

  • The total area of the Data Center is 2715 square meters. Of these, 930 square meters are occupied by 17 machine halls capable of accommodating 400 modules with client equipment.
  • The server rooms are equipped according to the building-within-a-building principle, which guarantees additional protection against any external factors.
  • There is a special access regime to the Data Center machine halls.
  • • The Data Center operates consistently without any downtime, unaffected even by a full-scale intrusion.

Electricity

  • There are two independent power sources with a capacity of 4 MW each.
  • Three uninterruptible power supplies with a capacity of 1.6 MW with one in reserve.
  • Autonomous diesel-generator sets are capable of providing stable and round-the-clock power to the Data Center for 10 days without the need for additional fuel supply.
  • Electricity consumption can be measured by room, module or half a module.

Cooling System

  • All key components of the cooling system -chillers and air conditioners are reserved according to the N+1 scheme.
  • 6 APC Uniflair BREF 2802A chillers, each with a cooling capacity of 650 kW.
  • The dual-circuit cooling system.
  • The freecooling function allows for the utilization of outside air during the cold season and ensures high energy efficiency for the entire Data Center.

Fire Extinguishing System

  • The Data Center is equipped with a fire alarm system and an automatic gas fire extinguishing system.
  • The special VESDA System based on aspiration sensors constantly analyses the air composition in the halls with server equipment deployed.
  • Each machine hall in the Data Center is equipped with an autonomous gas Fire Extinguishing System based on the innovative Novec 1230 gas, which does not harm health and IT equipment.
Colocation from 1U in the Data Center
The Colocation service for server equipment from 1U in the PARKOVYI Data Center is created for clients who have their own servers and want to ensure uninterrupted access to their equipment by placing it in the most secure data center in Kyiv. We offer the Infrastructure of one of the most technologically advanced commercial data centers in Ukraine and guarantee uninterrupted availability of operations and services 24 hours a day, 7 days a week.

The confirmed Tier III Design Certification by the Uptime Institute

The fault tolerance and stability of the entire Data Center equipment 24/7/365 under any conditions

Reliable storage of server equipment

The dual-circuit cooling, an early Warning System (VESDA) and uninterruptible power sources of 1.6 MW * 4 units.

Personalized pricing

The calculation of electricity consumption is calculated and billed for each client separately.

Data Сenter inside
About the PARKOVYI Data Center